Background
History
Original building built in 1965
New HVAC (1990)
New carpet for downstairs area (1996)
New roof installed in 1997
Sanctuary addition built in 1979/80
Total cost was about $250K ($75K loan from World Church)
Master drawing showed outline for a future wing (no details)
Fellowship hall refurbishment was planned at that time
- Remove the rostrum to increase floor space
- Install modern fold doors to subdivide into 3 small classrooms
New furnace (1995)
New roof (2002)
No upgrades since
Facilities Renovation